Difference between revisions of "Pre-upgrade VLA Tutorials"
From CASA Guides
Jump to navigationJump to searchLine 5: | Line 5: | ||
--> | --> | ||
* Continuum calibration and imaging | * Continuum calibration and imaging | ||
− | ** [[5 GHz continuum survey | + | ** [[Calibrating a VLA 5 GHz continuum survey]] |
* Spectral Line calibration and imaging | * Spectral Line calibration and imaging | ||
** [[NGC 5921: red-shifted HI emission]]. This tutorial is based on the annotated script provided in the [http://casa.nrao.edu/Doc/Cookbook/casa_cookbook.pdf Casa Cookbook]. | ** [[NGC 5921: red-shifted HI emission]]. This tutorial is based on the annotated script provided in the [http://casa.nrao.edu/Doc/Cookbook/casa_cookbook.pdf Casa Cookbook]. | ||
− | ** [[MRK 6: red-shifted HI absorption]]. This tutorial illustrates calibration | + | ** [[MRK 6: red-shifted HI absorption]]. This tutorial illustrates calibration and imaging of a spectral cube spread across two spectral windows (VLA 4IF mode). |
<!-- | <!-- | ||
* [[Imaging Flanking Fields]] | * [[Imaging Flanking Fields]] | ||
--> | --> |
Revision as of 13:34, 17 July 2018
- Continuum calibration and imaging
- Spectral Line calibration and imaging
- NGC 5921: red-shifted HI emission. This tutorial is based on the annotated script provided in the Casa Cookbook.
- MRK 6: red-shifted HI absorption. This tutorial illustrates calibration and imaging of a spectral cube spread across two spectral windows (VLA 4IF mode).